Seven jobs must be processed in two operations: A and B. All seven jobs must go through A and B in that sequence—A first, then B. Determine the optimal order in which the jobs should be sequenced through the process using these times: Job Process A Time Process B Time Position in Sequence 1 9 7 2 5 6 3 8 5 4 6 6 5 3 1 6 2 2 7 4 4

Seven jobs must be processed in two operations: A and B. All seven jobs must go through A and B in that sequence—A first, then B. Determine the optimal order in which the jobs should be sequenced through the process using these times:

Job Process A
Time Process B
Time Position in Sequence
1 9 7
2 5 6
3 8 5
4 6 6
5 3 1