The following table shows the progress o a given project at day 47 Duration Budget Cost Completed 1-2: Contact lo 250 450 380 100 2-3: Solieit 2-4: Design 4-3: Evaluate 12 0 18 350 100 3-5: Shoot 405 70 5-6: Place 16 (a) Draw the network diagram for this project, and determine slack times (b) Determine if the project is in control based on the time and cost to datę (USE PERFORMANCE INDICES). If not, what is the.cost overage or underage?

The following table shows the progress o a given project at day 47 Duration Budget Cost Completed 1-2: Contact lo 250 450 380 100 2-3: Solieit 2-4: Design 4-3: Evaluate 12 0 18 350 100 3-5: Shoot 405 70 5-6: Place 16 (a) Draw the network diagram for this project, and determine slack times (b) Determine if the project is in control based on the time and cost to datę (USE PERFORMANCE INDICES). If not, what is the.cost overage or